Click the pictures to enlarge
Tunnel Construction
Below Bridge
Caisson
Tolls at Night
Tolls 1963 Bridge Under Construction
Scammel Recovery Vehicle 1999
Electrical Distribution
Scarab Recovery Vehicle 1963
Tunnel Entrance
Traffic management system
Main Span
Tunnel Interior
Total Length
Resurfacing Tunnel
Traffic Control
Tunnel Construction
Scammell Recovery Vehicle 1999
Scarab Recovery Vehicle 1963
Tolls 1963 Bridge under Construction
Caisson Total Length Tolls at night 1999 Tunnel Interior Tunnel Entrance Traffic Control Traffic management system Main Span Replace Tunnel Road Deck Below Bridge Electrical Distribution
<back
© Le Crossing Company 2003
Operating the Dartford-Thurrock Crossing on behalf of the Highways Agency. Email
admin@lecrossing.co.uk